Beyond the Burndown: Evidence-Based Progress in Legacy Modernizations

6 April 2027 14:30 Maschinenhaus

When can the old system be switched off, and how do we know? In an incremental legacy modernization, the answer rests on a progress number nobody can easily substantiate. Status reports, burndowns and the memory of a few senior people each give a partial answer, and they drift apart. The cause is organisational as much as technical: knowledge of what the system should do sits with domain experts, knowledge of what it actually does sits in the code, and in many programmes nobody is responsible for linking the two for old and new system. Budget, parallel operation and the shutdown date depend on it. Traffic alone does not settle it: it shows what is used, not what is complete, and batch jobs, rarely used functions and data stay invisible. Drawing on our customer projects, we show what makes “almost done” a meaningful statement, which evidence from both systems can support it, and who should own the answer: a role, the teams, or the architecture function. A second question is just as important: does the modernized system deliver business value? We discuss how to measure it, for example, as a first proxy, the business transactions the new system actually handles. In a hands-on round, small groups define for one feature of their own system what “migrated” means, and how they would know.

Speaker